🚧 Construction Alert: Friday, Aug. 28 🚧 

An early-morning concrete placement is planned for Friday, Aug. 28, starting at 3 a.m. Crews will be placing concrete for the eastern bridge span deck. 

Here’s what to expect:
🔹 Flaggers will assist concrete trucks entering and exiting the work zone.
🔹 Nearby residents may notice construction lighting and early-morning construction noise. 

🔸 Please follow posted project signage, reduce speed through the work zone, and allow extra travel time. 

✨ Businesses remain open and accessible during construction. ✨ 

This information may change due to weather or field conditions. 

Stay updated:
760-502-0072 | SouthPalmCanyonBridge.com 

— 

🚧 Alerta de construcción: Viernes, 28 de agosto 🚧  

Una colocación de concreto en las primeras horas de la mañana está planificada para el viernes 28 de agosto, comenzando a las 3 a.m. Los equipos estarán colocando concreto para la plataforma del tramo del puente. 

Puede esperar: 


🔹 Los señaleros ayudarán a los camiones de concreto a ingresar y salir de la zona de trabajo. 

🔹 Los residentes cercanos podrían notar luces de construcción y ruidos en las primeras horas de la mañana. 

🔸  Por favor, siga la señalización del proyecto, reduzca la velocidad en la zona de trabajo y permita tiempo extra para viajar. 

✨ Los negocios permanecen abiertos y accesibles durante el proyecto.✨  

Esta información está sujeta a cambios debido a las condiciones climáticas o del terreno.  

Mantente informado :
760-502-0072 | SouthPalmCanyonBridge.com  

TRAFFIC CONTROL MAP

S.Palm Canyon.project traffic.2.23.26

INFORMATION about NEARBY BUSINESSES

Visit The Business Directory

Bridging the Community, Supporting Local
By shopping local, you’re not just making a purchase-you’re investing in the heart of Palm Springs. The business directory showcases the incredible shops, restaurants, and services that make our city special. Whether you’re looking for a great place to grab coffee, a unique gift, or essential services, you’ll find them right here.

About The NEW BRIDGE AND SCOPE OF WORK

The existing bridge, originally constructed in 1930, is outdated and structurally deficient. Also, the current bridge approach configuration creates a bottleneck for traffic on S. Palm Canyon Drive.The project constructs a new, 98-foot-long bridge on S. Palm Canyon Dr. across Tahquitz Creek and reconstructs the roadway approach at both ends of the bridge to improve safety, traffic flow, and mobility connection. The new bridge includes:

  • State-of-the-art structural, seismic, and hydraulic design
  • 2 traffic lanes in each direction, 4 lanes in total
  • A 14-foot-wide concrete center median with a public art installation
  • Concrete barrier rail with public art installations on both sides of the bridge
  • Widened, 8-foot concrete sidewalks in both directions
  • A dedicated bicycle lane in each direction
  • Reconstructs the roadway approach at both ends to address the existing traffic bottleneck
  • Removes and replaces the asphalt roadway, striping and concrete median north of the bridge to Sunny Dunes Road
  • Adds an ADA accessible driveway and pedestrian ramps at the intersection with Sunny Dunes Rd
  • Connects the southbound bike lane to Mesquite Road
  • Reconstructs Tahquitz Trail west of the bridge
Fact Sheet – English Fact Sheet – Spanish

Existing Conditions vs. Proposed Reconstruction

BEFORE - Westerly view of the existing 95-year-old bridge of Tahquitz Creek. BEFORE – Westerly view of the existing 95-year-old bridge of Tahquitz Creek. AFTER - Project rendering of completed South Palm Canyon Bridge. AFTER – Project rendering of completed South Palm Canyon Bridge. Visit here for more renderings

Project Timeline

Ps Timeline.10.24